Golayitdown
Veteran
No doubt. I’m in the same situation as you. I’ve had a contractor and his crew in my house I just bought for about 2 months and that’s the 33% method is the way they get down too. It’s super convenient and leaves no room for guessing because he doesn’t even ask for payment 2 and definitely not payment 3 without walking me through exactly what’s happening and getting me to sign off on it.Anyone here who pays the contractor upfront 100% if begging to get their shyt taken or asking for a lousy job. What the chick did was correct. When I bought my house back in 11, we did an expensive bathroom remodel on the master and kids bathroom. We paid 33% upfront which should have covered materials and then paid another 33% when it was 90% done. Paid the rest as soon as we were satisfied with the completion.
I’m probably paying many of times more than what her remodel costs since I’ve done kitchen, bathrooms, hardwood floors throughout and a bunch of other expensive stuff, but I would never enter into an agreement without those details being in writing and hammered out for even for the smallest of jobs.




