Spider-Man: Miles Morales | PS4/PS5 | Out Now

Gizmo_Duck

blathering blatherskite!
Joined
Aug 15, 2018
Messages
84,445
Reputation
7,215
Daps
183,606
Reppin
Duckburg, NY
The game was too short


I didn’t mind the length at all :dame:

Game was always meant as an app before part 2 and R&C. I just wish they didn’t charge 50 dollars for it. It should have been 30 or 40 at the most like lost legacy. I hope for a real sequel they do a lot to change some core mechanics to keep it fresh.

Someone told me they had to lower the swing speed due to the processing power of the ps4. If they can make swinging feel more fast and simulate actual g-force that would be dope
 
Joined
Nov 18, 2016
Messages
10,527
Reputation
1,579
Daps
33,578
And it didn't do much to separate itself. It was a tech demo and that's fine, but this isn't better that the first title. Insomniac has to bring it for SM2.
it was a next gen tease
some parts felt like an interactive movie but the entire game has to feel like that in the sequel
I want to see what developers, especially Insomniac, are able to do now that they weren't able to do before with the ps5
e.g. fast swinging
 

Dillah810

Flat Girther
Joined
May 2, 2012
Messages
50,351
Reputation
12,418
Daps
188,500
Reppin
Flint, Michigan
It cracks me up how come dudes look like corpses sometimes when they're defeated
EvGsLZiWYAAo7WS

EvGr3SgXcAAeXF8

EvGr7AIWQAISvS6

EvGsBGQXYAUqiqd

EvGsKFfXYAMjp8_
 

KOOL-AID

I Pitty Da Fool
Supporter
Joined
Aug 12, 2013
Messages
24,746
Reputation
16,443
Daps
69,920
how do i enable game mode or performance mode on my ps5 (i assume this not only enhances miles morales but every other game on my shyt)?
 

KOOL-AID

I Pitty Da Fool
Supporter
Joined
Aug 12, 2013
Messages
24,746
Reputation
16,443
Daps
69,920
yo this shyt not letting me up my ps4 saved files, its sai=ying its not found but i can see it in my storage :dahell:
 

Sterling Archer

Spider Mane
Supporter
Joined
May 16, 2012
Messages
36,460
Reputation
11,551
Daps
178,192
Reppin
Chicago
yo this shyt not letting me up my ps4 saved files, its sai=ying its not found but i can see it in my storage :dahell:
The game saves for Spider-Man is handled in-game not through the storage options on the PS5 (it’s stupid, I know). You have to install both the PS4 version of the game and the PS5 version. Boot up the PS4 version and “upload” the game save. Then boot up the PS5 version. It should give you the option to use the PS4 saves now.
 

Sad Bunny

they/them
Supporter
Joined
May 2, 2012
Messages
77,164
Reputation
3,201
Daps
172,144
This fire.

Just went and found the secret lab.

The invisibility is just :wow:
 
Top